EMC Legato Cert

EMC E20-616 PDF, Sale Discount EMC E20-616 Dump With Accurate Answers

FLYDUMPS is your premier source of EMC E20-616 Exam for Storage Administrators. With FLYDUMPS EMC E20-616 exam sample questions, no other vendor will be able to compare to quality EMC E20-616 test. lead4pass EMC E20-616 Training is always updated to provide you the most actual information available and this is done with the help of FLYDUMPS professional team of certification experts, technical staff, and comprehensive language masters who are always in-touch with the changes in the EMC E20-616 exam. So the true way for passing the EMC E20-616 Exam for Storage Administrators is to get in touch with FLYDUMPS, EMC E20-616 exam sample questions will lead to your EMC E20-616 Certification success.

QUESTION 22
You are installing a VMAX 10K with dispersed System Bay.
Which length cables are required to provide back-to-back separation?

A. 10M
B. 25M
C. 20M

D. 3.6M
Correct Answer: A QUESTION 23
You are installing a VMAX 40K with dispersed System Bay.
Which length cables are required to provide back-to-back separation?

A. 25M
B. 10M
C. 3.6M

D. 20M
Correct Answer: A QUESTION 24
What is the maximum number of High Density Storage bays that can be configured in a VMAX 40k?
A. 8
B. 10
C. 6

D. 4
Correct Answer: A QUESTION 25
What is the power level required for VMAX 20K High Density Storage Bay?
A. 4.9 kVA
B. 2.5 kVA
C. 5.3 kVA
D. 3.5 kVA

Correct Answer: A QUESTION 26
What is the power level required for VMAX 20K Standard Storage Bay?
A. 5.3 kVA
B. 2.5 kVA
C. 4.9 kVA
D. 3.5 kVA

Correct Answer: A QUESTION 27
You are installing a VMAX 40K with dispersed daisy chain Storage Bays. What is the maximum distance of separation?
A. 3.6M
B. 25M
C. 10M
D. 6.5M
Correct Answer: A QUESTION 28
What is the maximum distance for System Bay Dispersion in a VMAX 40K configuration?
A. 82.0 feet/25m
B. 32.8 feet/10m
C. 16.4 feet/5m
D. 49.2 feet/15m

Correct Answer: A QUESTION 29
How many cables are there to the Virtual Matrix from each Director in a VMAX 40K?
A. 4
B. 2
C. 8
D. 6
Correct Answer: A QUESTION 30
In a Symmetrix VMAX 40K, which engine is connected to the upper half of Direct Connect Storage bay 1D?
A. 8
B. 7
C. 1

D. 2
Correct Answer: A QUESTION 31
A CE is currently installing a VMAX 40K. Where should the light panel cables of the System Bay be connected?
A. Engine 4
B. 1st AC slot
C. Engine 5
D. 2nd AC slot Correct Answer: A QUESTION 32
How does the Service Processor communicate with all 8 engines in a VMAX 20K?
A. Ethernet cables are directly connected to Management Modules in engine 8 and engine 1, which are daisy chained to the other six engines.
B. Ethernet cables are directly connected to Management Modules in engine 4 and engine 5, which are daisy chained to the other six engines.
C. Ethernet cables are directly connected to each Management Module in each engine.
D. Ethernet cables are directly connected to the Management Modules in engine 4 which is daisy chained to the other seven engines. Correct Answer: A QUESTION 33
What is the maximum number of Storage Bays that can be attached to a Symmetrix VMAX 10K (987)?
A. 2
B. 1
C. 3
D. 4 Correct Answer: A QUESTION 34
What is the maximum number of Storage Bays that can be attached to a Symmetrix VMAX 10K (959)?
A. 3
B. 1

C. 2
D. 4 Correct Answer: A QUESTION 35
Which two System Bays use the same component layout when fully populated?
A. VMAX 10K 3 and 4
B. VMAX 10K 1 and 2
C. VMAX 10K 1 and 4

D. VMAX 10K 2 and 4 Correct Answer: A QUESTION 36
How many Management Modules are installed in a 6 bay VMAX 10K (987)?
A. 8
B. 12
C. 6
D. 4 Correct Answer: A QUESTION 37
What is the maximum DAE count for Engine 1 of a VMAX 10K (987) dense configuration?
B. 16

C. 18
D. 10

Correct Answer: A
QUESTION 38
When upgrading an existing I/O module to a DARE I/O module, what impact will it have on the VMAX 40K system?
A. No impact
B. Complete data loss
C. Degraded performance
D. Failover during upgrade

Correct Answer: B
QUESTION 39
Which action needs to be taken if the Backend Cabling Verification fails after a Data Center relocation?
A. Contact PSE Lab for assistance.
B. Relocate the cables shown as faulted.
C. Replace the cables shown as faulted.
D. Power down and re-start the Backend Cabling Verification script.

Correct Answer: A
QUESTION 40
While running the Backend Cabling Verification script, the LEDs do not match the SymmWin graphic. It halts with a message that there is a cabling error and advises moving cables. Which service engagement would require PSE intervention prior to moving the cables?
A. Data center move
B. Installation
C. DAE addition
D. Storage bay addition
Correct Answer: A
QUESTION 41
What is one of the activities of the VMAX Management Module?
A. Monitors the SPS unit
B. Call home Management
C. Failover Management
D. Fault Report Management
Correct Answer: A
QUESTION 42
Which component is used to connect the Service Processor to the Engines?
A. Management Module
B. System Interface Board
C. USB Port
D. Messaging Interface Board Enclosure

Don’t leave your fate to boring books, you should sooner trust FLYDUMPS EMC E20-616 exam sample questions. If you prefer the course on FLYDUMPS EMC E20-616 exam sample questions, then you will need to attend their class and their classroom sessions are quite expensive. FLYDUMPS EMC E20-616 pdf could be the passport for your career life since it covers everything needed to pass EMC E20-616 exam. EMC E20-616 Testing Engine are composed by current and active Information Technology experts, who use their experience in preparing you for your future EMC E20-616 exam sample questions available at FLYDUMPS will save you money, and get you started on the right road to making more with your new found skills.

You may also like